Records show 3 uptime checks were completed for istpress.ist.utl.pt in the 222 day interval beginning April 18, 2024. The operability of istpress.ist.utl.pt was confirmed 2 times total through assessments, evidenced by the 200 status code on April 18, 2024. Based on the assessments completed as of November 26, 2024, there were no periods of inoperability for istpress.ist.utl.pt. Out of 1 error responses, code 503 was identified as the most current error on November 20, 2024. Istpress.ist.utl.pt replied in 0.212 seconds on November 20, 2024, against its average response time of 1.734 seconds.